How a machine is packed decides what it costs per unit on the water. This guide covers what sets the container count, the documents that travel with the shipment, and the loading methods we quote from Qingdao Port.

Our published guidance is that a 40 ft container typically carries two to six machines, depending on the model and attachments. That is a range, not a promise: the exact loading plan and container type are confirmed with your quotation.

What decides how many machines fit

  • Machine dimensions. Overall width and height limit a container load, not weight. Published figures sit on each model page — the YH22, for example, is a 2,200 kg machine with a 1,300 mm overall width.
  • Attachments removed or folded. A bucket, boom, cab or canopy changes the transport envelope. Optional configurations on the YH22 include a cab, boom side swing and a chassis extension and retraction.
  • RO-RO or container. Roll-on/roll-off loads the machine as a runner; a container load usually means removing or stowing parts. The two options give very different counts for the same model.
  • Packing method. Loose loading, skidding, crating and dunnage all consume space. Every machine is checked and run before packing for export.

Standard container reference

The figures below are standard reference values for common 20GP and 40HQ containers, not measurements of YHONG equipment or of a specific box. Internal dimensions vary slightly between operators — confirm against the actual container with your forwarder.

ContainerInternal lengthInternal widthInternal heightDoor opening (W × H)Typical payload
20GP5.90 m2.35 m2.39 m2.34 × 2.28 m~28 t
40HQ12.03 m2.35 m2.69 m2.34 × 2.58 m~26–28 t

A 2.35 m internal width and 2.39 m door height rule out tall or wide configurations even when the floor area looks sufficient. Use the internal figures, not the external ones, when comparing against a spec sheet.

Documents you will need

  • Commercial invoice — the sale value and terms your customs authority assesses duty on.
  • Packing list — machine by machine, with weights and dimensions; this is the document the unloading crew works from.
  • Certificate of origin — issued for the shipment, used to claim preferential duty where your country’s trade terms allow it.
  • Bill of lading (or sea waybill) — issued by the carrier once the container is loaded.
  • Destination-specific certificates — some countries require additional conformity or import paperwork. Tell us the destination port at quotation stage and confirm the exact list with your customs broker.

The plant operates an ISO 9001 quality management system, and CE-related configurations are available on request. A configuration option is not a statement that a given certificate is held or supplied for your order; the certificate set is confirmed in the quotation.

Loading options

  • Break-bulk in a container. The machine is partly dismantled, driven or skidded in, then blocked and braced. Usually the lowest freight cost per unit for compact machines, at the price of more work at destination.
  • Flat rack. For a unit that is over-height or over-width for a standard box. The machine is lashed to the platform and shipped as out-of-gauge cargo; check the route height limit before assuming it is cheaper.
  • RO-RO. Driven aboard at Qingdao and driven off at destination. Nothing to unpack, but only on lanes and at ports with RO-RO service.

Get an exact loading plan

Send four things and we will come back with the loading plan and container type for your order:

  1. The model or models, with quantities.
  2. The attachments and any optional configuration (cab, canopy, chassis variant).
  3. The destination country and port.
  4. Your preferred shipping method, if you have one.

Correo: yhmy@chinayonghong.cn
Teléfono / WhatsApp: +86 166 7890 0362
Horario: Monday–Saturday, 08:30–18:00 GMT+8

Send model and destination port See published model dimensions

Loading plans are confirmed per order. Container counts, loading method, freight and sailing dates on this page are general guidance only; the binding plan is the one confirmed in your quotation.