How we build.
A compact machine is judged in the field, not on the specification sheet. Our production system is organised around the things that fail first: hydraulics, welds, paint and electrical connections.
01 / Production
From steel to shipment.
Cutting and forming
Cutting and forming are done on CNC equipment. Plate thickness and grade are checked against the drawing before a part enters the line.
Welding and inspection
Welded structures are inspected visually, with penetration checks on structural joints. Nothing moves to the paint line until the weld has been signed off.
Pre-treatment and paint
Painting uses a multi-stage pre-treatment. A baked top coat follows, which is what protects a machine left outdoors between jobs.
Assembly and final test
Every unit is assembled, filled, run and tested before it is packed. Test records travel with the machine documentation.
02 / Capacity
Volume without loose ends.
Capacity is only useful if it is repeatable. Fabrication, paint and final test stay in sequence, and the same checks apply whether a machine is built for a domestic customer or an export order.
Next step
Ask for a factory visit or a video audit.
We can walk you through the line and the test bay remotely, or host you in Jining.
